Case Studies | Chevron Traffic Management Skip to main content

We work with hundreds of organisations and off all different sizes, to implement a variety of traffic management solutions.

 

From temporary short-term traffic light hire to complex national infrastructure improvements on the road and rail network, we can provide whatever traffic management solution you need.

We believe that the key to client satisfaction is to “Deliver on our Promises” which is one of our company values. Our level of repeat business and feedback from clients is confirmation that we do indeed deliver on our promises.

Below is a selection of clients we have worked with and the benefits they have gained.

 

Digital Services case studies

SES Water

When a burst water main on the A217 in Banstead, Surrey required a carriageway closure, Sutton and East Surrey Water (SES Water) turned to Chevron TM for help. We implemented a cost-effective digital traffic management solution to ensure the safety of their workforce, provide information to local residents and traffic, and reduce the impact on road users.

Download the SES Water case study (PDF) to find out more >

Network Rail

To combat the rising number of road closure breaches by the public – which have the potential for loss of life to the individual, workers or rail users – Chevron TM together with digital specialist HRS developed a bespoke safety system that helps reduce the number of incursions by alerting the workforce of any breaches so that action can be taken quickly. We also developed an enterprise planning system which helped improve back office efficiency.

Download the Network Rail case study (PDF) to find out more >

 

Highways England

When a taper strike on the A45 Chowns Mill Improvement Scheme took out 50 cones and eight sequential lamps, thanks to the deployment of Intellicone Smart Taper technology the TSCO received and immediate alert. Within minutes an IPV was deployed and it took less than an hour to clear the carriageway of debris, reinstate the taper and ensure that the work force was once again properly protected.

Download the Highways England Intellicone Smart Taper case study (PDF) to find out more >

 

Network Rail

When Network Rail had previously carried out essential maintenance works at the Thorpe Bank level crossing near Doncaster it had led to high levels of hostility and threatening behaviour from the general public to their workers. Eager to avoid a repeat, Network Rail approached Chevron TM to implement a safe and cost-effective traffic management plan which could prevent incursions, protect rail workers and minimise interaction between rail workers and the general public. The solution was the creation of a digital enclosure using Intellicone® Portable Site Alarms, Customer Communication Terminals and CCTV, which resulted in zero threats or confrontations with the general public.

Download the Network Rail Thorpe Bank case study (PDF) to find out more >

 

Low-Speed case study

Kier and Lincolnshire Highways Alliance

For over a decade, Chevron TM has been providing a range of traffic management solutions to improve the traffic network across Lincolnshire. These traffic management solutions have met the high standards expected by our partners Kier, the local authority and conformed to regulatory requirements.

Download the Kier and Lincolnshire Highways Alliance case study (PDF) to find out more >

Highways and High-Speed case studies

Hanson and Bedford Borough Council

Traffic management operatives were digitally alerted to incursions or closure breaches during the resurfacing works of three high-speed roundabouts on the A6 from the A421 to Wilstead. The alerts allowed them to take immediate and appropriate action to remove themselves and the workforce from potential risk.

Download the Hanson and Bedford Borough Council case study (PDF) to find out more >

Highways England and DPD

Essential works on the approach to Logix Park from the A5 roundabout in Hinckley had the potential to severely disrupt one of the UK’s largest parcel logistics companies. Chevron TM worked in close collaboration with Highways England and their customer, DPD, to ensure that DPD’s operations continued throughout the works with minimal impact, and that their 490,000 parcels were sorted and ready to be delivered the next day.

Download the Highways England and DPD case study (PDF) to find out more >

Kier Highways

When Kier Highways was awarded the 4-year project to upgrade the A13 in Essex from two to three lanes, they selected Chevron Traffic Management to help scope and implement the traffic management requirements and site’s safety initiatives.

Download the Kier Highways case study (PDF) to find out more >

Balfour Beatty

To enable Balfour Beatty to upgrade the M4 to a Smart Motorway, our Professional Services team provided them with a range of temporary traffic management solutions. This allowed Balfour Beatty to accelerate the works, while reducing costs and ensuring the safety of the travelling public as well as the on-site workforce.

Download the Balfour Beatty M4 case study (PDF) to find out more >

Balfour Beatty

Chevron TM worked with Balfour Beatty to improve the A2 Bean and Ebbsfleet junctions in Kent. Traffic management services provided included swept path analysis, topographical surveys, design, drawings, safe working zone provisions, phasing strategies, preparing the TTRO application and final traffic management design.

Download the Balfour Beatty A2 case study (PDF) to find out more >

Professional Services case studies

Balfour Beatty

To enable Balfour Beatty to upgrade the M4 to a Smart Motorway, our Professional Services team provided them with a range of temporary traffic management solutions. This allowed Balfour Beatty to accelerate the works, while reducing costs and ensuring the safety of the travelling public as well as the on-site workforce.

Download the Balfour Beatty M4 case study (PDF) to find out more >

Costain

When Costain needed help preparing a GG104 safety risk assessment and 3D traffic management design as part of the M6 J21a-26 Smart Motorway upgrade project, they turned to Chevron TM for assistance. Our Professional Services team provided a swift and thorough response, ensuring that the temporary traffic management was optimised for all phases of the works.

Download the Costain case study (PDF) to find out more >

 

Balfour Beatty

Chevron TM worked with Balfour Beatty to improve the A2 Bean and Ebbsfleet junctions in Kent. Traffic management services provided included swept path analysis, topographical surveys, design, drawings, safe working zone provisions, phasing strategies, preparing the TTRO application and final traffic management design.

Download the Balfour Beatty A2 case study (PDF) to find out more >

Local Authority case studies

Kier and Lincolnshire Highways Alliance

For over a decade, Chevron TM has been providing a range of traffic management solutions to improve the traffic network across Lincolnshire. These traffic management solutions have met the high standards expected by our partners Kier, the local authority and conformed to regulatory requirements.

Download the Kier and Lincolnshire Highways Alliance case study (PDF) to find out more >

Crawley Borough Council

In partnership with Crawley Borough Council, Chevron TM has been keeping traffic moving, road workers safe and minimising disruption to its 100,000 local residents including traffic in and out of the UK’s second largest airport, Gatwick. We have been providing 12C Mobile Works for nearly 10 years to support the council’s works on its dual carriageways, national speed limit and 50mph roads including grass cutting, hedge trimming, litter picking, tree care, and grass verge and roundabout maintenance.

Download the Crawley Borough Council case study (PDF) to find out more >

Events case studies

The Boat Race

The Oxford and Cambridge Boat Race is arguably the most famous boat race in the world, and usually attracts hundreds of thousands of spectators along the River Thames. But in 2021, during the global coronavirus pandemic, spectators were banned and the Boat Race was moved to the River Great Ouse. Chevron TM created a bespoke traffic management plan to cover pre-event set-up, event day and post event clear up. On the day, Chevron TM implemented a secure zone around the race area to prevent spectators from attending and managed the closure of roads and riverbank footpaths before the races started and after they finished. Chevron TM also supported the installation of outside broadcast equipment and provided additional event security when required.

Download The Boat Race case study (PDF) to find out more >

Emerald Headingly Stadium

The Emerald Headingly Stadium is home to rugby’s Leeds Rhinos and Yorkshire Carnegie. Chevron TM provides expert traffic management during rugby fixtures which ensures the safety of visitors, fans and local residents, and contributes to a positive experience for all those attending.

Download the Emerald Headingly Stadium case study (PDF) to find out more >

Our certifications, accreditations and memberships

ROSPA
Avetta
BSC
Builders Profile
CECA
Construction Line
Exor
RISQS
BSI BIM
ISO-9001
ISO-14001
ISO-44001
ISO-45001
ISO-18001
ROSPA President's Award
BFRS
Greener Highways
TMCA